An existing, well aged and over capacity 11kV university electrical network upgrade for the full Sutton Bonington campus of the University of Nottingham.
McKee Associates were tasked with transforming an existing unused three-storey agricultural mill building into a new 11kV Network Substation, new 11kV Private University Substation as well as an upper level 415V Substation while causing minimum disruption / downtime on the university network.
Our design responsibilities included full 11kV & 415V design including grading study of the entire existing site 11kV network.