Quick contact.

A.Wigan Hall,
New Market Street,
Wigan.
WN1 1HH

T. 01942 945 990

E. info@mckeeassociates.co.uk
Welcome to our project with...

The Tree House Hotel

The Tree House Hotel

Company

The Tree House Hotel

Sector

Hotels & Leisure

Services

Building Management & Controls System Design (BMS)
Building, Condition, Due Diligence, Pre-Acquisition Surveys
Fire Alarm & Life Safety System Design
General & Emergency Lighting Design
Heating, Cooling & Ventilation Design (HVAC)
High Voltage Electrical Design
Hot & Cold Water Generation & Distribution
Low Voltage & Communication Design
MEP Cost Consultancy
Part L Compliance & Thermal Energy Modelling
Public Health Design
Renewable, Low Carbon & Sustainable Design
Revit, BIM & 3D Design
SAP / SBEM / BREEAM / MEP
Security & Access Control Design
Utility Infrastructure Design & Co-ordination

Project Overview

MA were appointed back in 2020 for the refurbishment of the existing Ramada hotel in the city centre of Manchester with the instruction to strip out and replace the MEP services and bring up to date the experience of the a new brand of hotel- The Tree House. Based on the only other one in the country in London, the brief was to replicate and better the hotel with quirky feel to the interiors. To be opened in 2023 this challenging hotel consists of 200 plus rooms including presidential suites, 2 function / ball rooms, gym, cinema, 2 restaurants, 3 bars and a roof top private area incorporating a bar. All MEP design works carried out to the hotel by MA with current on site roll being fulfilled until commissioning (circa 2023).MA were appointed back in 2020 for the refurbishment of the existing Ramada hotel in the city centre of Manchester with the instruction to strip out and replace the MEP services and bring up to date the experience of the a new brand of hotel - The Tree House. Based on the only other one in the country in London, the brief was to replicate and better the hotel with quirky feel to the interiors. To be opened in 2023 this challenging hotel consists of 200 plus rooms including presidential suites, 2 function / ball rooms, gym, cinema, 2 restaurants, 3 bars and a roof top private area incorporating a bar. All MEP design works carried out to the hotel by MA with current on site roll being fulfilled until commissioning (circa 2023).
Back to Projects.
A selection of images captured throughout the project development.